ABB Charging station Terra AC RFID, 4G, with display Type 2 cable incl. installation
Product information
Charging station Terra AC RFID, 4G, with display Type 2 cable incl. installation
eMobility charging station 22 kW TAC-W22-G5-R-C-0
The AC charging station delivers the outstanding quality expected from the market leader in electric vehicle charging stations. Space-saving and easy to install.
- Charging capacity 22 kW, 32 A 3-phase
- 5 m cable with type 2 plug
- Protective devices: Overcurrent, overvoltage, undervoltage, earth fault including DC residual current, integrated lightning protection
- With energy meter and access control via RFID and smartphone app
- LAN, WLAN, Bluetooth, Ethernet, RS-485 and 3G/4G, OCPP 1.6
- 1 potential-free input, 1 potential-free output
eMobility charging station 22 kW TAC-W22-G5-R-C-0
The AC charging station delivers the outstanding quality expected from the market leader in electric vehicle charging stations. Space-saving and easy to install.
- Charging capacity 22 kW, 32 A 3-phase
- 5 m cable with type 2 plug
- Protective devices: Overcurrent, overvoltage, undervoltage, earth fault including DC residual current, integrated lightning protection
- With energy meter and access control via RFID and smartphone app
- LAN, WLAN, Bluetooth, Ethernet, RS-485 and 3G/4G, OCPP 1.6
- 1 potential-free input, 1 potential-free output
|
Dimensions | |
|
|
|
width | |
195 mm | |
|
height | |
320 mm | |
|
depth | |
110 mm | |
|
Cable length | |
5 m | |
|
Interfaces | |
|
|
|
Interfaces | |
Ethernet | |
|
|
4G | |
|
|
|
3G | |
|
|
|
RS-485 | |
|
|
|
Bluetooth | |
|
|
|
WLAN | |
|
|
E-Mobility | |
|
|
|
Compatible with service | |
Load management | |
|
Access protection | |
RFID | |
|
Energy meter | |
Yes | |
|
Protective device | |
RCD type B with DC protection | |
|
Connection type | |
Type 2 charging cable | |
|
Charger | |
|
|
|
Charging capacity | |
22 kW | |
|
energy | |
|
|
|
Amperage | |
32 A | |
Information regarding installation
Normally an installation takes approx. 3-4 weeks from receipt of the installation permit
Information regarding installation
The installation flat rate offers you a comprehensive standard scope of services to commission your charging station conveniently and professionally. Installation usually takes approx. 3-4 weeks from receipt of the installation permit. After receipt of your order, you will be contacted by our installation partner to discuss the next steps.
The flat rate includes
- Digital HomeCheck (on-site visit if required)
- Cable/pipe surface-mounted installation up to 20 m, designed for 11 kW
- Maximum of two wall openings
- Small material
- Installation of a type A RCD in the power distribution board
- Installation and commissioning
- Proof of safety
- Installation and completion notification to the energy supplier
Additional small power distribution boards or special requirements of the energy supplier (e.g. load shedding) are not included . Services that go beyond the scope mentioned will be invoiced separately by the installation company.